Monday, August 1, 2011

Permits are Approved - Lot is Staked

The permits were approved on July 29th and by the next day, mysterious wooden stakes with pink flags were all over the lot. I say "mysterious" because after wandering the lot for 30 minutes, we still couldn't figure out exactly what they meant or what they were marking off.

We have our buyer/builder conference on Tuesday, August 2nd which will be the meeting where we walk through the blue prints, house design and lot plan with our construction supervisor. We've been told that the house should break ground the week of August 14th.

Our staked-off lot from the street looking diagonal to the back right corner of the lot:

Our staked-off lot from the street looking diagonal to the back left corner of the lot:

Caden and Bobby waving to me from what we guessed to be the spot of our future front door :)

Caden sitting next to the fire hydrant which will sit right next to the end of our drive-way:



No comments: