Tuesday, October 18, 2011

The Roof is On!

The roof is installed on our house!


The windows and fireplace in the two-story great room:

The entry-way between the two-story great room and the breakfast area/kitchen - the doorway on the left side of the photo is the door to the backyard:

The Windows are Installed!!

The windows are installed in our house!

Caden showing his enthusiasm for the new windows :)

View of the back of the house from the back left corner of the lot:

View of the back of the house from the back right corner of the lot:

 

House Wrapping...

Now the framing is officially finished and our house has been wrapped. You can see that the workers have already stacked the shingles on the top of the house, so the roof should be going on soon!

Caden and Bobby posing in front of the house in the bright sun:
Caden and Bobby posing in front of the house, from a different angle, in the bright sun:
Caden and Bobby posing in our front door:

Bobby looking out over the street from one of the windows in the master bathroom:

Atlas and Bobby posing in the doorway from the master bedroom to the master bathroom:


Monday, October 17, 2011

Finishing the Roof!

The workers are finishing up the boards on the roof. Following are photos of the house, beginning with the front left corner of the house and slowly circling around the right side of the house to the back.

Mom/Deb/Grandmere posing in front of the house:


The right side of the house. The garage on left-side of the 1st floor and Bobby's lower-level entertainment room with wet bar is on the righ-side of the 1st floor. The master suite is on the 2nd floor.

The back right corner of the house:

The back of the house:


Sunday, October 16, 2011

The Framing is Almost Finished...

The front porch is now covered and the roof braces are going in. All of the actual framing is finished so the house is really taking shape and looking like the home we designed:



The Garage is in and the Roof Begins...

The front of the house with the garage in...

The workers are building the roof braces in the front yard and getting ready to install them:

The Second Floor...

The 1st floor is now almost complete and work on the 2nd floor has begun! Here are Caden and Monique in front of the house:




Bobby and Caden in the dining room:

Caden posing with his room on the 2nd floor just above his head:




Back of the house:

More Walls...

Almost the entire first floor in now framed. Here is Caden in front of the house on a very rainy day.



Our front door :)

Wednesday, September 7, 2011

The walls go up!

The "house" portion of the build finally begins and we have a wall and some floor!
View from the street, looking toward the back right corner of the lot:

View from the street, looking toward the back left corner of the lot:

Our first wall! This will be the outer wall on the right side of the house (when looking at the house) and will be the outside wall to Bobby's finished, lower level entertainment room:

... and a little floor! Most of the main level sub-floor is down. I was standing in the garage when I took this photo. This will be the floor in the entry-way, office, dining room, half bath, great room and kitchen. Below the floor you can see our basement:

Monday, August 22, 2011

We have a basement and foundation!

After the workers started on the cement block basement and foundation, it was finished within 2 days. We can really see the house taking shape now and see where it will sit on the lot, the size of the house, etc. It's also really fun to see the house behind us go up!

View from the street, looking toward the back right corner of the lot. Our front porch is on the left side of the house and our garage is on the right side:

View from the street, looking toward the back left corner of the lot. Our garage is straight ahead and the gravel will eventually be our driveway:

The cement blocks have arrived

Aside from a little gravel spread around the hole, no actual work has been done. However, each day more and more giant piles of cement blocks are being delivered.

 
The first piles of cement blocks arrive at the lot:

Bobby standing in what will eventually be our garage:

Caden was helping me climb into the hole so we posed for a quick photo op:

Caden goofing around and posing for pictures in our "basement":



The "Footers" are laid down...

The cement "footers" have been poured for our house. The cement blocks for our our basement and actual house will be built on top of these.

From the front of the house:


From the back of the house:

Caden playing on a pile of dirt:

Sunday, August 7, 2011

Breaking Ground...

We no longer have just "dirt" and we now have a "hole"! The lot broke ground on Thursday, August 4th and our basement is now dug. The next step is working on the foundation and basement block.

Our hole!


Street views:


In front of our hole:


Caden on the excavator that dug our hole:


Bobby in front of the driveway: